MAO Zhi-ping, CHEN Li-geng, WU Jian-li. Analysis and optimization of incipient faulty prediction unit of large-sized oil-filled equipments in converter station[J]. 2013, 33(5): 47-49.
MAO Zhi-ping, CHEN Li-geng, WU Jian-li. Analysis and optimization of incipient faulty prediction unit of large-sized oil-filled equipments in converter station[J]. 2013, 33(5): 47-49.DOI:
换流站大型充油设备早期故障预测装置运行分析及优化
摘要
文中对鹅城换流站换流历年早期故障预测数据进行趋势分析和规律总结
提出优化建议
对提高换流站大型充油设备的使用寿命及保障换流站安全运行具有重要意义。
Abstract
The trend analysis of incipient faulty prediction data of Echeng Coverter Station are conducted
and rules are summarized
and some suggestions are given to extend the service life and improve safe operation of large-scaled oil filled equipment for converter station.