CHEN Yuanyang, HUANG Jiyuan, LI Xinran, et al. Necessity and feasibility of involving new fast energy storage systems in frequency regulation[J]. 2015, 35(6): 15-18+26.
CHEN Yuanyang, HUANG Jiyuan, LI Xinran, et al. Necessity and feasibility of involving new fast energy storage systems in frequency regulation[J]. 2015, 35(6): 15-18+26.DOI:
新型快速储能参与调频的必要性及可行性
摘要
对新型快速储能参与电网调频的必要性以及可行性展开研究。首先
通过分析区域电网及传统电源的频率特性、含传统储能—抽水蓄能的实际电网调频性能
分析引入新型快速储能的必要性;然后
通过分析新型快速储能的技术经济性能、参与调频的控制模式
说明其参与调频的可行性;最后
依据长株潭电网算例
仿真验证其对区间联络线功率性能的改善效果。结果表明
引进新型快速储能可以优化调度策略且提高网/省调的协调性。
Abstract
Necessity and feasibility of involving new fast energy storage systems in power grid frequency regulation are studied in this paper. Firstly
by analyzing the basic frequency characteristics of region grids and traditional generators and the frequency regulation performance of an actual grid containing traditional storage systems( pump storage plants)
the necessity of involving new fast energy storage systems in frequency regulation is illustrated. Then
by analyzing the technical and economic performance of new fast energy storage systems and their control mode in frequency regulation
the feasibility of their involvement in frequency regulation is proved. Finally
based on Chang-Zhu-Tan( CZT) Grid Case
the improvement scale of tie-line power control performances is measured through simulations. The results show that involving new fast energy storage systems can optimize the dispatching strategy and improve the coordination between networks.