Remote switch-on operation of 220 kV line circuit breaker failed several times in a certain power network.Incorrect synchro-check parameters and setting of measure-control devices caused the failure.Switch-on function with synchronism check of measure-control devices in 220 kV and above power network of Hunan was investigated and technical proposals were given from the respect of technical management.