The reservoir scheduling optimization technology is often subject to the water condition uncertainty and the low accuracy of long-term weather forecast Based on the difference of scheduling objectives and strategies during rainfall prediction
occurrence and ending stages
this paper proposes the three-stage scheduling optimization mode for before the rain
in the rain
and after the rain periods
which realizes the convergence of short and medium-term forecast and long-term optimal scheduling for hydropower station. It will avoid the situation that rising water level too high before the rain causing water abandonment
and also avoide the situation that water level descending too fast in the intermittent period after the rain causing long-term low waterlevel operation. So as to improve the efficiency of water resources utilization.