LI Jinming, YANG Tianbin, ZHANG Sha, et al. Research on Construction and Operation Fee of Power Cables in Integrated Corridor[J]. 2019, 39(1): 52-55.DOI:
电力缆线在综合管廊建设运维费用分摊探讨
摘要
综合管廊具有减少道路开挖、节约地下空间资源、延长管线寿命等作用
但过高的建设和运维成本制约着综合管廊健康持续发展
科学的收费方法对于综合管廊健康发展非常关键。本文以直埋成本法和空间比例法为基础
考虑管廊内各附属设施工程造价占比以及各管线对相关附属设施的要求
结合层次分析法
采用标准段2舱模型对各入廊管线综合得分和附属设施调整系数进行了计算
旨在为电力缆线在综合管廊建设运维费用分摊中提供一定的参考。
Abstract
Integrated corridor can reduce road excavation
save underground space resources and extend pipeline life. However
the huge cost of construction and operation fee has become the major constraints of the development of integrated corridor. A scientific method of charging is very crux to the development of integrated corridor. This paper takes account of the proportion of construction cost of ancillary facilities in pipeline corridor and the requirement of related ancillary facilities of pipeline based on the direct burial cost method and space proportion method. In order to calculate the comprehensive score and the adjustment coefficient of the auxiliary facilities
this paper adopts the analytic hierarchy process based on the standard segment with two cabins. The research results can provide some reference for the power cable in the operation and maintenance cost allocation of the comprehensive corridor construction.