The technical defects of Brazil ±800 kV Xingu convertor station led to chain reaction on March 21
st
2018. Widespread power outages affecting the entire country have had a significant impact in 14 northern and north-eastern Brazilian states. The general situation and the course of the accident of Brazilian power grid are introduced briefly in the paper. Furthermore
the main causes of the accident are analyzed in this article. On the basis of Brazilian blackout
Qishao DC transformation line is evaluated from the relay protection
configuration and strategy analysis of security and stability equipment
primary frequency regulation of power plants. Considering the actual condition of Hunan power grid