a heating fault of 110 kV transformer bushing is found through infrared temperature measurement. The process of fault inspection and treatment is introduced
and the reason of the heating fault is analyzed. The analysis result shows that the missing of inclined coil spring is the direct cause of this fault
and transformer operates normally after rectification. Finally
suggestions are put forward for analysis and treatment of such faults.