钟 平, 邹 志. 抽水蓄能项目投资风险评估及管控措施[J]. 大坝与安全, 2026, 0(2): 6-.
ZHONG Ping, ZOU Zhi. Investment risk assessment and control measures of pumped-storage hydropower project[J]. 2026, 0(2).
钟 平, 邹 志. 抽水蓄能项目投资风险评估及管控措施[J]. 大坝与安全, 2026, 0(2): 6-. DOI:
ZHONG Ping, ZOU Zhi. Investment risk assessment and control measures of pumped-storage hydropower project[J]. 2026, 0(2). DOI:
通过对抽水蓄能电站项目投资、建设、运行阶段的风险因素进行分析,得出项目投资风险评价结果。在投资主体多元化、投资环境复杂化、电力市场化条件下,未来可预见的一段时间内,大型抽水蓄能项目具有综合成本和服务能力优势,不存在否定性和不可接受的投资风险,项目投资风险可控。
Through analysis of risk factors during the investment
construction and operation phases of pumped-storage hydropower project
the investment risk assessment results are obtained. Under the con_ ditions of diversified investment subjects
complicated investment environment and electricity marketiza_ tion
large-scale pumped-storage hydropower projects are superior in terms of comprehensive cost and service capability
and there is no negative or unacceptable investment risk in the foreseeable future. Moreover
the investment risk is controllable.