XIE Xiong-yao, WANG Pei, LI Yong-sheng, et al. Monitoring data and finite element analysis of long term settlement of Yongjiang immersed tunnel[J]. 2014, 35(8).
XIE Xiong-yao, WANG Pei, LI Yong-sheng, et al. Monitoring data and finite element analysis of long term settlement of Yongjiang immersed tunnel[J]. 2014, 35(8).DOI:
is a 420 m long road immersed tunnel. It is on the soft soil foundation in a bend of Yongjiang River
which has caused large settlement. Moreover
the severe sediment deposition and 2.67m tidal range in Yongjiang River also have a great influence on the settlement of tunnel. Based on the monitoring data of settlement
the paper analyses the subsoil conditions
tide and desilting’s influence on settlement. And a finite element method based on fluid-solid coupling method is put forward to simulate the long term settlement
and the simulation results are in good agreement with the monitoring data. In addition
the key influencing factors of tunnel settlement
including subsoil condition
trench siltation and siltation and desilting above the element
are calculated and compared. The monitoring data and finite element analysis show that the subsoil condition is the main factor that determines the magnitude of settlement
and the settlement of tunnel on soft soil is much larger than that on other kind of foundations; because of the tidal range
tunnel is subject to an oscillation of elevation which may account for 4%~10% of settlement of operation period; the effect of silting on tunnel is obvious
but regular desilting can only decrease the settlement temporarily and cause the settlement cyclic variation. Although the monitoring data were obtained from a specific project
the conclusions of the study are sufficiently general and may apply in other immersed tunneling projects.