HU Wan-yu, CHEN Xiang-hao, LIN Jiang, et al. In-situ drilling tests of seepage in gravel soil core wall during the first impoundment in Pubugou hydropower station[J]. 2013, 34(5).
HU Wan-yu, CHEN Xiang-hao, LIN Jiang, et al. In-situ drilling tests of seepage in gravel soil core wall during the first impoundment in Pubugou hydropower station[J]. 2013, 34(5).DOI:
At present the prototype monitoring is commonly used to know the seepage in performance period in earth-rock dam. Much research to stable seepage and there is no report about in-situ drilling tests of seepage during the first impoundment. In Pubugou hydropower station,the core-wall is such thin and not decorated with any monitoring instruments at early time above the elevation of 788.00 m. Weak areas of anti-permeability are revealed probably by the earlier monitoring
in-situ drilling tests of seepage is carried out in the core-wall during the first impoundment at 0+131and 0+434 section in August 2010. The results of the test analysis shows that
weak penetration area exists at some elevation of section 0+131and section 0+434 in the core-wall of Pubugou hydropower station. It also shows that under the necessary condition
in situ drilling tests in the core-wall during the first impoundment is practical and meaningful. The anti-permeability of fissured soil under the protection of reversed filter is suggested to be evaluated
the seepage monitoring in core-wall should be strengthened to inspect the safety of the core-wall. The experiment researches provide a reference for other gravel soil core wall of the dam design