HUANG Zhi-peng, DONG Yan-jun, LIAO Nian-chun, et al. Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station[J]. 2012, 33(S2).
HUANG Zhi-peng, DONG Yan-jun, LIAO Nian-chun, et al. Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station[J]. 2012, 33(S2).DOI:
The excavation height of left slopes at Jinping I hydropower station is 530 m; faults and deep fracture were developed
unloading range is deep; and its geological conditions is complicated. Slope stability problems are important especially in the construction and operation. The engineering monitoring geological conditions of the slope is analyzed; deformation monitoring layout for the slope is described. The deformation monitoring system of the slope consists of surface deformation observation
shallow deformation observation and deep deformation observation. In three levels
monitorings of the slope deformation are made. For the surface deformation monitoring the geodetical surveying method is used; for the shallow deformation observation the multi-point displacement meters are used; the monitoring depth is 0-90 m; for the deep deformation observation the flat hole ranging
level survey and graphite convergence meters methods
etc
are used installed in exploration flat hole
through the main fault and deep crack
the biggest monitoring depth reach 260 m. By May 2011
monitoring data indicate that the maximum horizontal displacement in surface and shallow is 106.1 mm; the maximum settlement is 58.6 mm; which are controlled by excavation and supporting; the maximum horizontal displacement in deep is 47.48 mm; the maximum settlement is 7.2 mm
controlled by faults and deep fractures. The displacement tends to converge
the maximum deformation rate is 0.1 mm/d; and it meets the designed safety standards