NIU Fu-jun, LIN Zhan-ju, LU Jia-hao, et al. Study of the influencing factors of roadbed settlement in embankment-bridge transition section along Qinghai-Tibet Railway[J]. 2011, 32(S2).
NIU Fu-jun, LIN Zhan-ju, LU Jia-hao, et al. Study of the influencing factors of roadbed settlement in embankment-bridge transition section along Qinghai-Tibet Railway[J]. 2011, 32(S2).DOI:
The Qinghai-Tibet Railway (QTR) project was finished on July 1 2006
and has served for over five years. Judging from the present situation
the roadbed is stable and train speed in permafrost regions achieves 100 km/h as expected during the designing. However
as half part of the roadbed was constructed over the permafrost characterized by high ground temperature and high ice-content
slight changes of the permafrost might lead to roadbed problems
of which the settlement in embankment-bridge transition section is an obvious and special one. Investigated results of 164 bridges from the Xidatan Basin to the Chiqu Valley along the QTR showed that the settlement was influenced by factors including bridge orientation
embankment slope direction
embankment height
ground temperature
ground ice-content of permafrost and local subgrade soil type. For the average value of the settlement
it was greater at the northern end of a bridge than that at the southern end
and was greater in sunny-slope than that in shady-slope. It was greater in high-ice permafrost regions than that in low-ice regions
and was greater in high-temperature permafrost regions than that in low-temperature regions. Additionally
it increased logarithmically with the height of the embankment. In regions where the subgrade soils were dominated by silt
silty clay or fine sand
the settlement amount was higher than that in bedrock regions. Correlation analysis results show that there are good relationships between the settlement and the slope direction
embankment height
ground temperature and ice contents when some of the later items are quantified. And the correlation coefficients are 0.234