ZHENG Gang, LIU Qing-chen, DENG Xu, et al. Field measurement and analysis of effect of excavation on existing tunnel boxes of underlying metro tunnel in operating[J]. 2012, 33(4).
ZHENG Gang, LIU Qing-chen, DENG Xu, et al. Field measurement and analysis of effect of excavation on existing tunnel boxes of underlying metro tunnel in operating[J]. 2012, 33(4).DOI:
The Xiqing Road Tunnel of Tianjin West Railway Station Hub crosses over the existing tunnel boxes of the operating Tianjin Metro Line 1. The bottom plate of the Xiqing Road Tunnel is just 0.3 m away from the upper plate of the existing tunnel boxes
so the deformation of existing metro tunnel due to construction should be controlled strictly. The design bring forward some pertinence construction plans and measures
including ground improvement
excavation in sections and back pressure of heaped load timely. Base on the analysis of monitoring data during the construction and excavation of anti-floating piles and triaxial cement mixing pile of Xiqing Road Tunnel adjacent to the existing metro tunnel
and the corresponding deformation rules and characteristics in the different stages are summarized. The measured results show that the construction of bored piles adjacent to the existing metro tunnel could lead to the tunnel settlement
while the excavation could cause the heave of the tunnel. Due to excavation in sections
Back pressure of heaped load as well as the observational method
the vertical deformation of existing tunnel caused by excavation and the different deformation between the two adjacent boxes can be controlled effectively.