In order to overcome the defects such as short single cycle footage
low utilization of blast-hole
too many blasting fragment pieces assembled near the roadway heading face
insufficient excavation of dip roadway floor and so on
that often occur in dip roadway excavation
the new cut formation of wedge cut with assisted holes that used to enhance the thrown effect of fragment pieces is designed. The designing of the new cut formation bases on the new idea that using the middle empty holes to assist the broken cut holes in throwing the fragment pieces out of the cut cavity during the blasting. For the sake of proving the advantage of the new cut formation
many in-situ experiments are conducted in the Huaheng coal mine. By means of changing the layout of the cut holes
changing detonating sequences
setting special auxiliary holes to increase the throw distance of the blasting fragment pieces
and using mixed arrangement type of auxiliary holes
three kinds of design schemes of dip roadway blasting excavation are formulated. Through the analysis of single cycle footage
depth of the blast-hole left after blasting
outline of the laneway after blasting
thrown distance of the fragment pieces
lumpiness of the fragment pieces
and height of the fragment pieces in front of the roadway heading face
the perfect blasting design is put forward
of which the overall indicator is the best. Thanks to the technique
the single cycle footage of the coal mine increases by 40% everymonth. The success of the test proves the validity of the technique to overcome the defects in coal mine dip roadway excavation.