ZHANG Jia-fa, DING Pei-zhong, ZHANG Wei, et al. Studies of mechanism for transition zone to control seepage field in concrete faced rockfill dam[J]. 2011, 32(12).
ZHANG Jia-fa, DING Pei-zhong, ZHANG Wei, et al. Studies of mechanism for transition zone to control seepage field in concrete faced rockfill dam[J]. 2011, 32(12).DOI:
the seepage stability of the dam is satisfied; while the concrete face cracks locally or does not work properly
it is pivotal for the transition zone to control seepage field in the dam and to keep seepage stability. Taking the concrete faced rockfill dam of Shuibuya Hydropower Station for example
the coefficient between cushion layer and transition zone is analyzed; it is indicated that tests are necessary to study filtering and protection of transition zone for cushion layer. Tests are performed with cushion layer and transition zone material of whole size gradation; and the seepage deformation and filtering effect is studied. Synthesizing the test results and the results in author’s papers published already
the mechanism for the transition zone to control the seepage field in superhigh concrete faced rockfill dam is concluded. The transition zone
together with the main rockfill zone
could drain efficiently water from cushion layer. Ones the concrete face cracks or does not work properly
the interior structure of the cushion layer would change with the fine particles moving downward along water flow. Fortunately
with the protection of transition zone
the particles would stop around the interface between the two zones; and seepage stability of the cushion layer would be maintained. In the first abnormal experience
some fine particles would move out from the transition zone; but the framework of the material would remain stable. With the support of the main rockfill zone
the transition zone could continue to function at both aspects of filtering and drainage.