HUANG Qiang-bing, PENG Jian-bing, DENG Ya-hong, et al. Design parameters of Xi’an metro line 2 tunnel passing through active ground fissure zones[J]. 2010, 31(9).
HUANG Qiang-bing, PENG Jian-bing, DENG Ya-hong, et al. Design parameters of Xi’an metro line 2 tunnel passing through active ground fissure zones[J]. 2010, 31(9).DOI: