as a model for general prediction of petroleum economy and resources
is used to predict roadbed settlement based on the process of roadbed settlement under the linear or approximately linear loading and the characteristics of the Usher curve. Through analyzing the differential equations of the Usher model
it is pointed out that the Logistic model and Gompertz model used for settlement prediction of foundation at present are two simplified patterns
but to the actual condition
the applicability of the Usher model is better. The calculation methods of the parameters in Usher model are expounded; and they are applied to the calculation for an example; the comparison of results between the three models shows a good agreement
which indicates that the Usher model advised in predicting the subsoil settlement is reasonable. The example also indicates that the Usher model has a higher forecast accuracy and may be adopted in engineering practice.