In the tunnel lining structure internal force calculation
it is indeterminacy for mechanics parameters of surrounding rock and parameters of structure. At the same time
the indeterminacy has the boundary
which can be estimated by a reasonable interval numbers in engineering. Changing a single random variable in the interval numbers
the structural internal force can be solved by adopting a finite element equation. But in the case of multi-variable
considering indeterminacy of calculation model and complexity of mathematical solution
the finite element procedure can be used to educe the action effect of each variable to structure’s internal force
then the interval values consist of different parameters are obtained; and the interval values of tunnel lining structural inner force are confirmed finally. The method can provide a new method for the calculation of interval numbers of tunnel lining and engineering application.