Using stochastic continuum model to simulate hydro-mechanical processes in deformed fractured rock during tunnel excavation
岩土力学2008年29卷第10期
作者机构:
河海大学 岩土工程研究所,南京,210098
作者简介:
基金信息:
DOI:
中图分类号:O242.1
网络首发:2013-08-03,
纸质出版:2008
稿件说明:
移动端阅览
陈 伟, 阮怀宁. 随机连续模型分析裂隙岩体耦合行为[J]. 岩土力学, 2008,29(10).
CHEN Wei, RUAN Huai-ning. Using stochastic continuum model to simulate hydro-mechanical processes in deformed fractured rock during tunnel excavation[J]. 2008, 29(10).
CHEN Wei, RUAN Huai-ning. Using stochastic continuum model to simulate hydro-mechanical processes in deformed fractured rock during tunnel excavation[J]. 2008, 29(10).DOI:
The coupled hydro-mechanical processes in fractured rock during tunnel excavation are analyzed
using the stochastic continuum model that represents the spacial variability in hydraulic properties of fractured rock mass. The stochastic permeability fields are generated with the sequential indicator simulation
which is a non-parametric geostatistical technique and allows the input of the permeability probability distribution of arbitrary shape. The resulted permeability fields are then mapped onto the 3D finite element grids for the coupled hydro-mechanical analysis. A joint material model that can represents the weaken planes with specific orientations is used for the mechanical calculation in the study. The results show that the stochastic continuum model can predict the inflow rate into the tunnel; and the natural
spacial variability in hydraulic properties plays an important role in the coupled hydro-mechanical processes of the fractured rock mass. It is also found that the pore pressure will rise quickly before the water has a chance to move and equilibrate at the beginning of every excavation stage. This transient coupled hydro-mechanical effect may cause local failures in rock.