The design of reinforced high rock slope is made by analyzing its stability. The detailed programme is to utilize combined anchor and concrete. And the design is proved to be efficient with finite difference method. The finite difference model of the reinforced slope is created. The slide face disappears after reinforcing; and the stability coefficient meets the safe rule. The whole slope is stable. The method and conclusion are efficient to actual slope engineering and design.