The bored cast-in-place pile with prestressed anchor is mainly combined to support the excavation
and the medium wells are precipitated to process the groundwater. The dangerous situations as well as the environment influence due to the excavation construction are analyzed with the safe monitoring material. The dangerous situations appeared in the excavation construction are satisfactorily solved by the diligent work of all construction units; the safe operation of the excavation and the environment are ensured.