DONG Zhi-hong, DING Xiu-li, ZHANG Feng, et al. Analysis of deformation monitoring of large-scale underground
powerhouse during construction period[J]. 2006, 27(S2).
DONG Zhi-hong, DING Xiu-li, ZHANG Feng, et al. Analysis of deformation monitoring of large-scale underground
powerhouse during construction period[J]. 2006, 27(S2).DOI:
Monitoring is one of the important bases for dynamic design and information construction in underground project
and the analysis and reporting of monitoring information are even more important
if they are all-sided
accuracy and timely. The excavation of underground powerhouse of Pengshui project in Wujiang River faces many problems
such as large-scale span and height
complex geological conditions
long period
the disturbance of construction
etc. In order to ensure safety of construction and operation
many monitoring instruments were installed in underground powerhouse
which were used to monitor the deformation and stability of surrounding rockmass in construction. The analysis of monitoring results indicate: the surrounding rockmass of underground powerhouse is stable in general; design supports can enhance the self-stability of rockmass and ensure the stability of underground powerhouse; however
the stability of some local rock masses
especially the shale in the downstream sidewall are bad due to geological condition and rockmass blasting.