Based on a large amount of laboratory and field experiments
and the excavation modeling experiment
through the analysis of the genesis
texture and structure of drifted material formed in different period
the engineering geologic conditions of forming hole in deep drified material are studied; and the physico-mechanaical parameters are achieved precisely. A wide span hole in deep drifted material has been successfully excavated at Xilongchi Pumped Storage Power Station. And the experimental excavation
observation and analysis are done to know whether the hole can be formed in the drifted material formed in the first period; and a lot of experiments in lab. and infield also are done. Finally
the physico-mechanical parameters of drifted material are achieved precisely. Through careful design and careful construction
it is successfal to dig big span hole in the deep drifted material.