precaution way of high pressure water blow-out and the curtain grouting blocking
which are adopted to deal with the high pressure water blow-out in the extra long tunnel. The paper also analyzes and discusses the construction process of the tunnel in the zones rich in karst and water. The available construction project is put forward.