A research on increasing mining upper limit is important for coal mining
which can fully utilize coal resources and release most of the mines from the tension of limited successive exploitation. Based on the hydrologic and geologic data and data of nearby mines
taking the N2601 working face of Tianzhuang Mine for example
water resources of the producing area and water-existing character of the floor are analyzed; based on the plastic strain of the cover rock
the height range of caving zone and water flow fractured zone are analyzed through numerical simulation; finally
the upper mining limit is obtained by synthesizing the numerical simulation and exploitation regulations.