Based on the surveys of engineering geology and hydrogeology conditions and analysis of the experimental results of laboratory and field testing
the reason of Chaoyangpo landside is discussed. The investigating results show that the special topography and geology conditions are the main factors of the landside. By analyzing and evaluating of the present landside stability
the comprehensive reinforcing measures are proposed; and good results are obtained. The conclusions of are of referential significance to the similar engineering.