Analysis of structure calculations for branch pipes subject to high hydraulic pressures of Huizhou pumped storage station
岩土力学2006年27卷第S2期
作者机构:
广东省水利电力勘测设计研究院,广州,510170
作者简介:
基金信息:
DOI:
中图分类号:TV732+.43
网络首发:2006-12-16,
纸质出版:2006
稿件说明:
移动端阅览
郑晶星. 惠州抽水蓄能电站岔管结构计算分析[J]. 岩土力学, 2006,27(S2).
ZHENG Jing-xing. Analysis of structure calculations for branch pipes subject to high hydraulic pressures of Huizhou pumped storage station[J]. 2006, 27(S2).
郑晶星. 惠州抽水蓄能电站岔管结构计算分析[J]. 岩土力学, 2006,27(S2).DOI:
ZHENG Jing-xing. Analysis of structure calculations for branch pipes subject to high hydraulic pressures of Huizhou pumped storage station[J]. 2006, 27(S2).DOI:
The reinforced concrete branch pipe subject to high hydraulic pressures of Huizhou storage pumped station
because of its PD value exceeding 6000
complex structure form
complex hydrological geology and engineering geology
is the key and formidable problem of the project. Based on permeable tunnel design theory
the followings are computed separately: the branch pipe excavation country rock crustal stress field in the construction period; the steady seepage of high pressure branch pipe
the concrete line’s stress-strain and country rock safety in the operation period; the concrete line’s stress and strain in the emptying inspection period of high pressure branches. The high pressure branch’s reinforce steel is also computed.