According to reinforcing and adjusting of several incline villas with pile foundation building in Taihu Lake
based on the study of design
constructing and a long period of settlement monitoring
the reason of the villas incline is analyzed; and how to driven new reinforced pile press close to pile already existed
and fasten them together
is studied. A new method for incline pile foundation adjusting is put forward
which increase pile settlement through disturbing around the pile under the load of the structure. Monitoring settlements indicate that the method put forward is effective and economic
and also prove that when calculating settlement and load of each pile
assuming structure and foundation as rigid accords with the fact.