The Badong Yangtse Bridge is a large highway bridge across the Yangtse River
connecting the No.209 national highway to the new town of Badong County. The bridge is a kind of simply supported cable stayed bridge of 900.5 m length
of which the 388 m main span has two towers of 218 m high. The bridge’s weight is huge and the safety requirement is high
The bridge lies in the middle part of the Three Gorges where the geological condition is the most complex area. There are cliffy landform
sharply incised valley
complicated geo-structure
heavily cracked rock mass
frequent landslide and common debris flows. The slope stability has directly effect on the safety of bridge. On the basis of investigating the bridge site’s geotechnical condition
the stability of slope was simulated by nonlinear elastoplastic finite element method and block limit equilibrium principle. At the same time
the developing trend of the slope’s stability was predicted while the reservoir storing and the bridge building up. The researches show that the bridge’s weight
fluctuating water lever and earthquake are induced factors of slope’s failure. The stability of the slope is sharply decreased after the reservoir storing and the bridge building up. The slope may slide along the interface between T2b3 and T2b2. Some control measures must be taken. In this paper the effect of slope failure on the bridge was analyzed. Finally
some suggestions about existed problems are proposed.