contact surface between segments and soil and stress releasing
3D-FEM is put forward to simulate shield tunnel construction and analyze the earth deformation caused by tunnel construction. The computation results are satisfied compared with the practical measurements; and the ideas and methods in the paper can provide valuable reference for researches on earth deformation and even for tunnel construction management.