The construction scheme of tunnels passing through landslide area and fault zone of the repair tunnel for Changkou water tunnel of Zhangjiu River water diversion and supply project in Kunming is introduced in detail
including such contents as description of tunnel collapse to ground surface
ground settlement pit treatment
collapse body treatment in tunnel
constructuon procedure and technical measures of pass through landslide area. Construction practice has shown that the tunnel collapse treatment scheme is reasonable