TONG Zhong WANG Jian-bin. Monitoring and analysis of displacements of soft soil embankment with jointed vacuum-preloading treatment[J]. 2002, 23(5).DOI:
The monitoring design has been discussed in detail about soft soil embankment ( segment K54+350~K54+560
Guang -Zhao expressway ) which is treated by jointed vacuum-preloading method . The rich inspection results have been obtained. Through analyzing the obtained data
it is shown that the jointed vacuum-preloading treatment method is successful; and it can be adopted in the similar engineering cases.