Plastic wick drain and preloading method is adopted to consolidate the soft ground. The construction procedure is reasonably planned; and the systems of drainage and monitor are reasonably arranged. Through analyzing the results of monitoring and checking data
it is shown that the effect of consolidation of soft ground is excellent; and the design standard is reached.