中电投江西电力公司景德镇电厂2×660MW超超临界机组转入正式商业运行后
因受燃料市场影响
煤质达不到设计值
造成锅炉各项经济指标均达不到设计值
飞灰可燃物较高
根据本厂实际情况进行分析
对一次风系统进行了专项调整试验
提出了改进措施
使得机组运行参数得到改善
提高了锅炉效率
希望对同类机组的一次风系统优化调整有一定的借鉴作用。
2×660 MW ultra supercritical unit of Jingdezhen power plant of China power investment Jiangxi branch into a formal commercial operation
due to fuel the market influence
coal can not reach the design value
the boiler economic indicators are not up to the design values
combustible matter in fly ash is higher. The actual situation of our factory are analyzed
special adjustment test of air system is undertook
and some improvement measures are put forward
the unit operation parameters are improved
the boiler efficiency is raised
and hope has some reference to primary air system optimization adjustment of similar units.