刘新刚, 闫广新. Analysis on Needs for Pumped Storage Hydroplant in Urumqi and Changji Electricity Grid of Xinjiang[J]. 2012, (1): 82-84.DOI:
新疆乌鲁木齐昌吉电网对抽水蓄能电站的需求分析
摘要
"十二五"期间
新疆乌鲁木齐昌吉电网将新增电源装机5660MW
其中火电5565MW
水电95MW
另外还计划新增1250MW的风电装机。由于新增的火电机组中
热电机组约占66%
届时将继续加大电网的调峰压力。本文从乌鲁木齐昌吉电网负荷特性出发
分析研究乌鲁木齐昌吉电网调峰容量盈亏
从而得出乌鲁木齐昌吉电网对抽水蓄能电站的需求容量。
Abstract
During "Twelfth Five-Year Plan" period
Urumqi and Changji power grid will add power supply of 5 660 MW
in which there are thermal power of 5 565 MW and hydropower of 95 MW. In addition
it is also planned to add wind power of 1 250 MW. Because thermal power generating units accounted for about 66% in the added power plant
it will continue to increase the power grid’s pressure of peak load regulation. From the perspective of load characteristics of Urumqi&Changji power grid
the loss of peaking capacity in Urumqi&Changji power grid is analyzed in this article so as to get the demanding capacity for pumped storage power station in Urumqi&Changji power network.