发电厂的接地系统长期在地下土壤中易受腐蚀
影响电厂正常运行。对发电厂接地网的金属腐蚀的危害和腐蚀机理进行分析
提出了几种解决接地网及引下线腐蚀的措施
最后推荐了发电厂接地网防腐的设计方案。
Earthing system of power plant are easily been corroded since exposure underground for long time
this could affects the safe running of plant. The principle of metal corrosion of earthing system and its risk was analyzed
several solve measures were proposed
from which
the anticorrosion design scheme of power plant was selected.