重庆钢铁(集团)有限责任公司环保搬迁指挥部
纸质出版:2011
移动端阅览
[1]陈彦.重钢汽动风机电气控制系统的优化改造及其应用[J].能源研究与管理,2011(01):59-60+80.
陈彦. Optimal Ttransformation and Implementation for Electric Control System of Team Fan of Chong Steel[J]. 2011, (1): 59-60+80.
[1]陈彦.重钢汽动风机电气控制系统的优化改造及其应用[J].能源研究与管理,2011(01):59-60+80. DOI:
陈彦. Optimal Ttransformation and Implementation for Electric Control System of Team Fan of Chong Steel[J]. 2011, (1): 59-60+80. DOI:
针对重钢4#、5#汽动风机辅助设施的电气控制系统存在的一些不合理并影响风机安全运行的问题
提出优化解决的方案、措施并给予改造实施。
In this paper
some unreasonable problems of electric control system in No.4 and 5 steam fan auxiliary facilities of Chong steel were proposed
this problems could affect the safe operation of wind turbine.Optimal solutions and measures to reform implementation were introduced.
0
浏览量
19
下载量
CSCD
关联资源
相关文章
相关作者
相关机构