电网峰谷差越来越大
核电机组长期接带基本负荷运行
解决电网调峰问题
配套建设调峰电站是非常必要的。
As the difference between peak and valley of the power network is getting greater
and the nuclear units are always running at base load
the building of the corollary power plants for peak load regulation is quite necessary.