The ground height of 220 kV line hanging and dismantling grounding wire in traditional substation is about 7 meters from the ground.It is high in the working place
difficult in operation
and high in personal and equipment safety risks.Therefore
it proposes an integrated mobile work platform for hanging and dismantling grounding wire.Based on the analysis of the practical problems existing in the traditional grounding wire operation grounding
the traditional working tools and instruments are improved from three aspects of safety
convenience and stability.Combined with the actual scene operation
it verifies the feasibility and advancement of the operation platform.Compared with the traditional insulation climbing tool
it can make the operators can carry out the hanging and dismantling grounding wire operation in a relatively safe and stable environment
and reduce the risk of personnel falling and equipment damage caused by unstable standing and insufficient power.