He Ming. Overcurrent Protection Configuration and Setting Scheme for Distribution Network Considering Distributed Generation Supply Access[J]. 2021, 44(6): 7-12.
He Ming. Overcurrent Protection Configuration and Setting Scheme for Distribution Network Considering Distributed Generation Supply Access[J]. 2021, 44(6): 7-12.DOI:
The fault current of distributed generation is nonlinear and intermittent
which brings challenges to the setting and coordination of the traditional three-stage overcurrent protection in distribution networks. Aiming at this problem
the control strategy and fault characteristics of inverterubased distributed generation are analyzed
and combined with the positive sequence fault additional network
an overcurrent protection setting scheme suitable for the distribution networks with distributed generation is proposed. The scheme firstly uses the idea of adaptive protection to design the main protection setting method
and then the overcurrent relays on both sides are used as the near backup protection for the faults occurring near the other terminal
and finally the definite time overcurrent protection is used as the far backup protection for the entire line. Simulation results based on PSCAD show that the proposed scheme can reliably and accurately identify the faults with different types and locations.