Research on Optimal Placement for Complete Set of Primary and Secondary Integrated Overhead Pole Mounted Switch in Distribution Lines through Forest and Grassland
GAO Yiwen. Research on Optimal Placement for Complete Set of Primary and Secondary Integrated Overhead Pole Mounted Switch in Distribution Lines through Forest and Grassland[J]. 2022, 45(4): 26-31.
GAO Yiwen. Research on Optimal Placement for Complete Set of Primary and Secondary Integrated Overhead Pole Mounted Switch in Distribution Lines through Forest and Grassland[J]. 2022, 45(4): 26-31.DOI:
the installation and placement of the complete set of overhead pole mounted switches for the primary and secondary integration of 10 kV distribution lines of power supply company is only based on experiences
and its installation quantity and location will directly affect the fault disposal effect of the distribution lines passing through forests and grasslands. In order to scientifically carry out switch installation and location
an optimal placement algorithm for the complete set of overhead pole mounted switches based on the improved discrete binary particle swarm optimization (DBPSO) is proposed. The test results show that the proposed algorithm can achieve the optimal switch location combination through fewer iterations
which can provide a scientific reference for the installation and location of the primary and secondary integrated overhead pole mounted switch in distribution network
and give full play to the actual effect of switch fault disposal.