BAI Yue-mei1, WANG Hao-sen2, WANG Hao31.Huaneng Qinling Power Generation Co Ltd. RETROFIT FOR OPTIMIZING ALLOCATION OF TURBINE'S SUPERVISORY INSTRUMENTS AND TRANSIENT DATA MANAGEMENT SYSTEM[J]. Thermal power generation, 2009, 38(8): 125-126.
BAI Yue-mei1, WANG Hao-sen2, WANG Hao31.Huaneng Qinling Power Generation Co Ltd. RETROFIT FOR OPTIMIZING ALLOCATION OF TURBINE'S SUPERVISORY INSTRUMENTS AND TRANSIENT DATA MANAGEMENT SYSTEM[J]. Thermal power generation, 2009, 38(8): 125-126.DOI:
Directing against problems of software and hardware fault as well as dead computers resulted from bad installalation environment of turbine's supervisory instruments(TSI) and transient data management(TDM) system for sub-supercritical 200 MW units manufactured at home and equiped in Qinling Power Generation Co Ltd
a retrofit for improving the topogical structure of said system
upgrading the corresponding softwares of the system
as well as modifying the remote display and the operating manipulation
has been carried out.After retrofitting
the reliability of TSI and TDM has been enhanced
the faults of dead computers etc.haven't occurred again.