YU Zhen-huaShanghai Waigaoqiao Second Power Generation Co Ltd. OPTIMIZATION OF MEDIUM-VOLTAGE AUXILIARY POWER SYSTEM FOR 900MW UNITS[J]. Thermal power generation, 2009, 38(11): 104-108.
YU Zhen-huaShanghai Waigaoqiao Second Power Generation Co Ltd. OPTIMIZATION OF MEDIUM-VOLTAGE AUXILIARY POWER SYSTEM FOR 900MW UNITS[J]. Thermal power generation, 2009, 38(11): 104-108.DOI:
900MW机组中压厂用电系统优化
摘要
在分析了上海外高桥第二发电有限责任公司中压厂用电系统结构的基础上
拟定了优化方案、实施步骤和优化后的效果。中压厂用电系统结构优化后
总功率为2 000 kW的电动机负荷转移到3 kV厂用电母线上
总容量为32 000 kVA的厂用变压器设备转移到10 kV厂用电母线上
总容量为25 200 kVA的厂用变压器设备分别组成2个10kV辅助段
正常运行时由厂高压变压器提供电源。优化保留了原设计的优点
大幅降低了外购电量
提高了机组运行的经济性。
Abstract
On the basis of analysing the structure of medium-voltage auxiliary power system in Waigaoqiao Power Plant no.2
an optimization scheme
steps of its implementation
and the effectiveness after optimization have been worked out.After optimization of the structure concerning medium-voltage auxiliary power system
the motors' load of total power 2 000 kW in the medium-voltage auxiliary power system has shifted onto 3 kV bus of auxiliary power
the auxiliary transformer equipments of total capacity 32 000 kVA being shifted onto 10 kV bus of the auxiliary power
the auxiliary transformer equipments of total capacity 25 200 kVA being composed into two auxiliary sections of 10 kVA respectively
being supplied from high-voltage auxiliary transformer during the time of normal operation.The advantage of original design is reserved in optimization
electricity puchassed from outside being decreased by a big margin
enhancing the economic efficiency in operation of units.