某电厂4号300MW机组汽轮机运行中出现异音
大修解体发现高压进汽插管断裂并严重损坏。对高压进汽插管结构进行的试验分析表明
高压进汽插管原设计为两道密封环密封结构
后改为钟型罩密封
但在钻紧定螺钉的螺孔时
造成销孔部分螺纹缺失而使紧定螺钉脱落和专用销退出
使插管失去水平方向的活动裕量
在热应力的作用下插管承受较大力矩断裂而导致异音。对此
将断裂和存在缺陷的进汽插管进行了更换
加固了紧定螺钉
并提出了进一步的防范措施。
Abstract
Abnormal noise occurred in operation of 300 MW steam turbine equipped for unit no.4 in one Power Plant.In disassembled major repair
the plug-in pipe for HP steam incoming has been discovered to be ruptured
and being seriously damaged.Test and analysis for the structure of said plug-in pipe show that the structure of said plug-in pipe was originally designed with two sealing rings
and later being retrofitted into bell-shaped seal
but during the time of drilling screw hole
a partial of screw threads of the pin hole have been damaged
making the fastening screw to be drop-off
and the special pin to be out from its position
and the plug-in pipe to lose movement allowance in the horizontal direction
finally the plug-in pipe is ruptured due to bearing large moment of force under the effect of thermal stress.For this
the ruptured plug-in pipe and that with defects have been replaced
reinforcing the fastening screw
and further preventive measures being put forward.