YUAN Guoquan, YE Zhi'an, YANG Yonggang, et al. COMMISION DEBUGGING OF MAKE-UP WATER TREATMENT USING LIME FOR CIRCULATING WATER IN ONE THERMAL POWER PLANT[J]. Thermal power generation, 2011, 40(4): 81-84.
YUAN Guoquan, YE Zhi'an, YANG Yonggang, et al. COMMISION DEBUGGING OF MAKE-UP WATER TREATMENT USING LIME FOR CIRCULATING WATER IN ONE THERMAL POWER PLANT[J]. Thermal power generation, 2011, 40(4): 81-84.DOI:
某火电厂循环水补充水石灰处理系统调试
摘要
某火电厂循环水补充水采用石灰处理
简要介绍慢速脱碳处理工艺系统及流程。针对系统运行出现的出力达不到设计值和出水氯根超标问题
通过试验优化加药量
最终使系统出力达到了设计值2 500 m3/h
加酸(浓硫酸)后pH值为8.0~8.3
出水碱度0.65 mmol/L
浊度2.0 NTU
氯根132 mg/L
符合循环水补充水石灰处理设计要求。同时
达到了电厂循环水浓缩倍率提高到6的要求。
Abstract
The make-up water treatment using lime is adopted for circulating water in one thermal power plant
the technological system and process of slow speed decarbonization have been briefly presented.Direting against the problems occurred in operation of said system
such as the output capacity doesn't reach the designed value
and the chlorine radicals exeeding set standard
the dosage of chemicals has been optimized through tests
the output capacity of the system is finally being made to reach the designed value 2500 m3/h
after dosing concentrated sulfer acid
the pH value being 8.0~8.3
the alkalinity of effluent water0.65 mmol/L
the turbidity2.0NTU
the chlorine radicals132 mg/L
tallying with the designed requirements of make-up water treatment using lime for the circulating water.At the same time
the requirement of enhancing the concentration cycles of circulating water in the power plant to 6 has reached.