超临界350MW机组锅炉排烟温度偏高原因分析及技术改造
摘要
首批国产超临界350 MW机组锅炉投产以来
均出现了排烟温度明显高于设计值的问题
其主要原因是锅炉空气预热器吸热量不足。华能东方电厂通过对省煤器、空气预热器改造
降低了排烟温度
每台机组年可节约标准煤约3 850 t
减少二氧化硫生成量85t以上
减少二氧化碳排放量9 000 t以上。
Abstract
Since putting the boiler of supercritical 350 MW unit in Huaneng Dongfang Power Plant into operation
the problem of discharged flue gas temperature being substantially higher than the designed value has appeared.The main cause is insufficient absorbed heat in the boiler's air preheater.Through retrofit of the economizer and the air preheater
the temperature of discharge flue gas has been decreased
the saved standard coal of each unit can reach about 3850 t in one year