WANG Liang Huaneng Anhui Branch Company. APPLICATION OF DRAIN PUMP TECHNOLOGY FOR LOW-PRESSURE HEATER OF 600 MW UNITS[J]. Thermal power generation, 2011, 40(9): 83-85.
WANG Liang Huaneng Anhui Branch Company. APPLICATION OF DRAIN PUMP TECHNOLOGY FOR LOW-PRESSURE HEATER OF 600 MW UNITS[J]. Thermal power generation, 2011, 40(9): 83-85.DOI:
超临界600MW机组低加疏水泵的改造
摘要
华能巢湖发电有限责任公司1、2号超临界600 MW机组投产初期低压加热器(低加)疏水泵经过多次调试
始终不能正常投入运行。分析认为
该机组低加疏水泵系统阻力较大
达不到泵的必需汽蚀余量
从而使疏水泵入口产生汽蚀
不能满足高负荷连续运行的要求。为此
将低加疏水泵首级叶轮改为双吸叶轮。改造后
低加疏水泵在600 MW额定负荷下汽蚀余量大于泵的必需汽蚀余量
可连续运行
满足机组运行需要。
Abstract
The drain pumps of low-pressure heaters for supercritical units no.1 and no.2 in Huaneng Caohu Power Generation Co Ltd
through tests of many times during initial period of putting them into operation
still can't normally put into service from begining to end.It is believed from analysis that the resistance in drain pump system of low-pressure heater for said units is larger
and the necessary cavitation margin of said pumps can't be reached
thereby
making the exit of drain pumps to produce cavitation
can't satisfy the requirements in continuous operation under heavy load.For this
the first-stage impeller of said drain pumps has been retrofitted into one double-suction impeller.After retrofitting
the cavitation margin of said drain pumps under rated load of 600 MW is larger than the necessary cavitation margin
can keep continuous operation
satisfying the requirements in operation of units.