XIAO Guohua1, WANG Chunming2, TIAN Xiao1, et al. CAUSE ANALYSIS OF TUBE BURSTS OCCURRED ON FINAL-STAGE SUPERHEATER OF BOILERS AND PREVENTION MEASURES THEREOF[J]. Thermal power generation, 2012, 41(3): 78-82.
XIAO Guohua1, WANG Chunming2, TIAN Xiao1, et al. CAUSE ANALYSIS OF TUBE BURSTS OCCURRED ON FINAL-STAGE SUPERHEATER OF BOILERS AND PREVENTION MEASURES THEREOF[J]. Thermal power generation, 2012, 41(3): 78-82.DOI:
and tensle and impact tests under room temperature
the causes leading to tube burst occurred on final-stage superheater of boilers for 2×362 MW units in first-phase project of one power plant have been analysed.Results shows that the breakage of tube 1(T22) on final-stage superheater was related to improper design of the welding seam
the metallographic structure and mechanical property of tube materials being unqualified;the rupture of tube 2(T91) on final-stage superheater was caused by improper execution of welding technology
making slag to be existed on fusion line and high hardness in welded seam.For this
it is recommented that the angle-welding seam of roof-entrance tube and the sealing plate have to keep away from the butt-welding seams on sealing plate as possible
improving the weld structure of sealing plate and tubes