ZHU Ke1, KANG Jingqiu2, HU yiqun1, et al. APPLICATION OF IMPROVED DEB COORDINATED CONTROL ON LARGE DELAY CONTROL OBJECT[J]. Thermal power generation, 2012, 41(6): 57-61.
ZHU Ke1, KANG Jingqiu2, HU yiqun1, et al. APPLICATION OF IMPROVED DEB COORDINATED CONTROL ON LARGE DELAY CONTROL OBJECT[J]. Thermal power generation, 2012, 41(6): 57-61.DOI:
For the No.3 subcritical 600MW unit of Shenhua Guohua Jinjie Energy Co.
Ltd.of Shaanxi Province
the response of fuel amount on the steam pressure changes has long pure delay and large inertia.According to this characteristic
an improved direct energy balance(DEB) control system which increased the dynamic pre-over modulation fuel feed-forward control system was proposed to replace the existing simple direct instruction balance(DIB) control system.Field application showed that
the improved coordination control system overcame the impact of long delay link on the main steam pressure regulation.When the unit load command changed
the control system quickly regulated the valve opening of steam turbine
thus
response delay of boiler master control to load changes was eliminated or reduced;through rationally configuring larger proportions of the dynamic pre-overshoot fuel feedforward volume
the heat storage was timely improved
so the dynamic deviation of main steam pressure was reduced.Before the main steam pressure changes
EDB control system dynamically pre-regulates fuel quantity according to the boiler heat signal
so the main steam pressure can quickly track its set value.Therefore
the improved DEB control system has good adaptive ability on the long delay