ZHU Yewei 1, ZHAO Qingsen 2, SUN Quanrong 2 1.Shenhua Shendong Power Company Limited. THERMAL ECONOMY ANALYSIS ON CZK150/145-13.2/0.294/535/535TURBINE[J]. Thermal power generation, 2012, 41(12): 5-7.
ZHU Yewei 1, ZHAO Qingsen 2, SUN Quanrong 2 1.Shenhua Shendong Power Company Limited. THERMAL ECONOMY ANALYSIS ON CZK150/145-13.2/0.294/535/535TURBINE[J]. Thermal power generation, 2012, 41(12): 5-7.DOI:
the influence of factors such as attemperation water of superheated steam and reheat steam
operation of thermal equipments like heater and drain pump on the energy consumption of CZK150/145-13.2/0.294/535/535 type turbine was investigated.Results showed that
reheater attemperating water increased the unit heat consumption by about 18.94 kJ/(kW·h)
which was much more greater than that of the superheater attemperating water(2.24 kJ/(kW·h)).Thus
to keep a higher operation rate of the high pressure heater and drain pump
suggestion that during the unit running the reheater attemperating water should be used as less as possible was given.